The Weekly Dispatch: Holiday reading

In this Weekly Dispatch:

  1. AEMO Services Tender 3 results have been announced including wind, solar PV, BESS and compressed air storage.
  2. The CSIRO has released the consultation draft of GenCost 2023-24.
  3. AEMO Services has published the 2023 Infrastructure Investment Objectives Report.
  4. Energy Ministers Bowen, D’Ambrosio and Duigan have submitted a rule change request on transmission cost allocation.
  5. The Victorian Supreme Court has ruled against a community group opposing major transmission projects in Victoria.
  6. EnergyAustralia’s Tallawarra B power station commences operation in NSW.
  7. Podcasts of the week: Energy Insiders interviews Merryn York, Head of System Design, on the 2024 Draft ISP.
Related Posts
Reaching new lows

For the last couple of weeks, the energy industry has been dominated by discussions about the long foreshadowed closure of Read more

Small potatoes?

Following the announcement of the National Energy Guarantee, the sector has been awash with speculation about the specifics of this Read more

Talkin’ bout our generation

Since the release of Dr Finkel’s review, the term ‘dispatchable generation’ has been appearing more and more across the NEM. Read more